Description
A Beachfront Master Community in Al Mairid
Maseel Phase 1 is the first release of Maseel, a beachfront community by Tiger Group in the Al Mairid area of Ras Al Khaimah. The development covers about 145,000 sq m around a curved bay with a marina, and it is planned so that sea views reach every part of the site, including the rear sides of the apartment buildings. Sales are at the expression of interest (EOI) stage, so prices, sizes and terms are indicative until the developer opens formal bookings.
Homes at Maseel
The master plan brings together seven residential buildings, each with 16 residential floors, along with 59 townhouses with garden views, 17 beach villas with direct beach access, 16 garden villas and six villas on the breakwater. Phase 1 is listed with apartments and townhouses, and homes are listed as furnished. The EOI prices shared so far are:
- Studios: from AED 580,000, around 392 sq ft
- One-bedroom apartments: AED 944,000, around 638 sq ft
- Two-bedroom apartments: AED 1,490,000, around 1,132 sq ft
- Three-bedroom homes: AED 5,780,719, around 3,959 sq ft
Detailed floor plans have not been released yet.
Waterfront Lifestyle and Amenities
Life at Maseel centres on the water. The plan includes gated beach access, a marina with a yacht dock, floating sports courts, a round lagoon with a waterfall, a splash park, swimming pools and space for water activities. On land there is a central community park with picnic areas, a butterfly park, sky gardens and rooftop green spaces linked by shaded pathways.
For sport and wellness, residents will have padel, tennis and basketball courts, a running track, a gym, a spa and sauna, an outdoor cinema and a kids' play area. Everyday needs are covered by a nursery, a clinic, a community mosque, a co-working space, an entertainment hall, a barber and a beauty salon, a 360-degree rooftop restaurant and more than 100 retail units.
Location
Al Mairid lies on the Ras Al Khaimah coast beside Khor Al Mairid, close to the Al Mairid fish market and breakwater. The developer gives drive times of about 5 minutes to the E11, 12 minutes to shopping malls, 15 minutes to golf clubs, 30 minutes to Ras Al Khaimah International Airport and 40 minutes to Jebel Jais. Wynn Al Marjan Island is about 36 minutes away, Sharjah International Airport about an hour and Dubai International Airport about 1 hour 10 to 20 minutes.
Payment Plan and Handover
A 50/50 payment plan has been listed, with half paid before handover and half on handover, but the instalment schedule has not been published. The handover date has not been announced.
About Tiger Group
Tiger Group, which markets its homes under the Tiger Properties name, is a UAE developer with a long record of residential buildings. Maseel takes the group to a beachfront master community on the Ras Al Khaimah coast.
Why Register Interest Now
Registering at the EOI stage gives early access to unit choice in a beachfront community with a marina and private beach access, with studio prices starting below AED 600,000. Because details are still being finalised, buyers should confirm the final price, layout, payment schedule and handover date before booking.